EE/PAC/Kop/Tech/No. 0235 |
Karad |
E-Enquiry for repairs of laptops under PAC Division, Kolhapur.
|
13-09-2022 |
21-09-2022 |
(37 KB)
|
EE/EHV(O&M)/NND/TS/File No.73/No.678 |
Aurangabad |
E-Enquiry: Work of stub strengthening at location no. 105 to 110 except loc no. 107 of 132kV Waghala-Jangamwadi circuit-1 & circuit-2 DC line under EHV(O&M) Division, Nanded.
|
13-09-2022 |
19-09-2022 |
(753 KB)
|
7000024634 |
Nagpur |
E-tender for hiring of Battery Operated Self Propelled, Articulated Boom Indoor Man lift (Service Platform) having working Height more than 15 Meters at HVDC Terminal Station, Chandrapur. Estimated Cost:- Rs. 6,49,000/- (Including all Taxes)
|
13-09-2022 |
20-09-2022 |
(17 KB)
|
EEC/Dn./PBN/Tech/W-172/No.398 |
Aurangabad |
E-Enquiry: The work of Grass Cutting at 132 kV Parbhani Sub Station Premises, Dist. Parbhani., under EHV CCCM Division Parbhani.
|
13-09-2022 |
19-09-2022 |
(3.2 MB)
|
7000024418 |
Nashik |
2nd call Notice for Work of AMC for Split type and window type Air Conditioners of various capacities at various 220kV and 132kV sub-stations under EHV O&M Division, Jalgaon.
|
13-09-2022 |
20-09-2022 |
(358 KB)
|
EE/PAC II/ Dn./ Pune/425 Date: 12.09.2022 |
Pune |
E-enquiry for providing Office Chairs as per Schedule at PAC II Division, PCMC, Pune. (dated 12-09-2022)
|
13-09-2022 |
21-09-2022 |
(393 KB)
|
7000024469 |
Aurangabad |
SRM E-Tender Time Limit Extension: Work of replacement of Faulty Diffrential line protection RED670 relays at 132KV Kannad S/s & enabling impedence protection feature in differential relays at 132KV Baramati agro for 132KV Kannad – Baramati Agro line under EHV O&M Division Aurangabad.
|
13-09-2022 |
19-09-2022 |
(291 KB)
|
7000024575 |
Vashi |
RFx for Overhauling & supply of spares for 400kV C.B.Pole AREVA/Alstom make SF6 circuit breaker under 400kV RS(O&M)Dn, Padghe.
|
13-09-2022 |
19-09-2022 |
(700 KB)
|
7000024617 |
Vashi |
Providing Services for work of preparation & processing of forest clearance proposal of EHV transmission line and obtaining NOC approval from forest department as per forest conservation ACT 1980 and Amendments thereunder and Guidelines issued by GOI and GOM with regards to forest for Construction of 132kV DC Line from 220kV Boisar-II substation to proposed 132kV Dapcheri substation.
|
12-09-2022 |
20-10-2022 |
(115 KB)
|
7000024617 |
Vashi |
Providing Services for work of preparation & processing of forest clearance proposal of EHV transmission line and obtaining NOC approval from forest department as per forest conservation ACT 1980 and Amendments thereunder and Guidelines issued by GOI and GOM with regards to forest for Construction of 132kV DC Line from 220kV Boisar-II substation to proposed 132kV Dapcheri substation.
|
12-09-2022 |
30-09-2022 |
(1023 KB)
|
7000024617 |
Vashi |
Providing Services for work of preparation & processing of forest clearance proposal of EHV transmission line and obtaining NOC approval from forest department as per forest conservation ACT 1980 and Amendments thereunder and Guidelines issued by GOI and GOM with regards to forest for Construction of 132kV DC Line from 220kV Boisar-II substation to proposed 132kV Dapcheri substation.
|
12-09-2022 |
20-09-2022 |
(940 KB)
|
7000024611 |
Karad |
SRM RE-Tender for Tower footing resistance measurement of various 220/132/110 kV lines, under EHV O&M Division, Ratnagiri.
|
12-09-2022 |
19-09-2022 |
(284 KB)
|
RFx: 7000024403 |
Pune |
Time Extension for the Work of PID (Punctured Insulator Detection) testing of various 400kV Lines under EHV O&M Circle Solapur (dated 12-09-2022)
|
12-09-2022 |
14-09-2022 |
(132 KB)
|
7000024546 |
Karad |
Work of providing & fixing of Auxiliary relays required for separation of Auxiliary protection of Differential relay at various S/Stn. under EHV O&M Dn. Karad.
|
12-09-2022 |
19-09-2022 |
(90 KB)
|
7000023644 |
Karad |
SRM RE-Tender for Repairing & Overhauling of various make Air Compressor at various EHV S/s, under EHV O&M Division, Ratnagiri.
|
12-09-2022 |
19-09-2022 |
(420 KB)
|
7000024443 |
Karad |
SRM E-Tender for Replacement of 145 kV HV B ph Bushing with lead modification & attending oil leakage of OLTC by replacement of Epoxy cast Terminal board between CG make OLTC & Main tank of 25 MVA BBL Make PTR#1 at 132 kV Kankavali S/s, under EHV O&M Division Ratnagiri.
|
12-09-2022 |
19-09-2022 |
(213 KB)
|
317 |
Karad |
E-Enquiry for repairing work of control room main table and lockers as per schedule ‘A’ at 400KV R. S. Division Talandge
|
12-09-2022 |
19-09-2022 |
(491 KB)
|
EE(st)/MSA/ABAD/SM/Enquiry-10/No.230 |
Aurangabad |
E-Enquiry(Fourth Call): Annual maintenance contract for the work of grass removal & weed control by chemical treatment as anti weeding treatment at Major Store, “A”, Waluj Custody under Major store "A" Division, Aurangabad for six months period.
|
12-09-2022 |
20-09-2022 |
(823 KB)
|
318 |
Karad |
E-Enquiry for Annual maintennace work(AMC)of lift/Elevator as per schedule ‘A’ at 400KV R.S.Division Talandge
|
12-09-2022 |
19-09-2022 |
(684 KB)
|
7000024449 |
Karad |
Corrigendum for Capital improvement of existing shop for accommodation of MSEDCL offices at Vijaynagar, Karad, Dist. Satara.
|
12-09-2022 |
13-09-2022 |
(99 KB)
|