Maharashtra STU
- Inviting comments/suggestions on draft Penalty Mechanism to TSU's for existing unutilised bays, future un-utilized bays and de-allocation of identified bays by 22nd July 2025 18.00Hrs
.
- Draft methodology for availability and acquisition of 15-minute time block-wise monthly POA data required for determination of adjusted Base TCR
.
- Under process RE Applications as on 05.05.2025
.
- Guidelines for Selection of Transmission Projects to be executed under TBCB.
.
- STU Comments on stakeholder's feedback/suggestions received on Guidelines for selection of Transmission projets to be executed under TBCB.
.
- List of Planned InSTS Substations for RE evacuation as on 31.01.2025
.
- Inviting Comments/Suggestions on the Draft Guidelines for Selection of Transmission Projects to be executed under Tariff Based Competitive Bidding Framework within State of Maharashtra - Extension of time Period for submission thereof
.
- Notification Implementation of Revised Procedure for grant of Grid Connectivity to projects based on Renewable Energy sources to Intra-State Transmission System.
.
- Revised procedure for Grant of Grid Connectivity to projects based on Renewable Energy sources to Intra-State Transmission System.
.
- RE Applications under process as on 06/01/2025.
.
- STU Comments on stakeholders feedback/suggestions received on Revised RE Grid Connectivity Procedure.
.
- Revised Petition for determination of STU Fees and charges for 5th control period (from FY2025-26 to FY2029-30)
.
- Excel model for STU Fees and charges for 5th control period (from FY2025-26 to FY2029-30)
.
- Executive Summary of the STU Fees and charges Petition.
.
- Revised Petition for determination of InSTS Tariff for 5th control period (from FY2025-26 to FY2029-30)
.
- Excel model for determination of InSTS Tariff for 5th control period (from FY2025-26 to FY2029-30)
.
- Invitation for Stakeholders to provide Feedback on the Draft Revised Procedure for grant of Grid Connectivity to projects based on Renewable Energy sources to Intra-State Transmission System - Extension for Time Period for submission of feedback
.
- Invitation for Stakeholders to provide Feedback on the Draft Revised Procedure for grant of Grid Connectivity to projects based on Renewable Energy sources to Intra-State Transmission System.
.
- Inviting Comments/Suggestion on draft STU’s Procedure for Grant of Long/Medium Term Green Energy Open Access
.
- Formats formulated towards “STANDARD PLANNING DATA".
- Inviting Comments / Suggestions on the Draft “Integrated Resource Plan" prepared by IIT-Bombay in consultation with STU & SLDC for Five Years (FY 2023-24 to FY 2027-28).
.
- Formats formulated towards “STANDARD PLANNING DATA".
1. STU Plan and Updates
- STU Plan
- STU Plan for 2025-2028
- Transmission Tariff For Intra-State Transmission System
- TCR of TSUs
- MTC/GCC
- Minutes of 14th Maharashtra Transmission Committee (MTC) meeting held on 18 July, 2025
.
- Minutes of 13th Maharashtra Transmission Committee (MTC) meeting held on 17 April, 2025.
- Agenda points for 13th Maharashtra Transmission Committee (MTC) meeting to be held on 17.04.2025.
- Minutes of 12th Maharashtra Transmission Committee (MTC) meeting held on 27 January, 2025.
- Mid term review petition for determination of InSTS Transmission Tariff for FY 2023-24 & FY 2024- 25
2. GoM Renewable Energy Policy and Methodology- RE Policy 2008
- Methodology RE Policy 2008
- RE Policy 2015
- Methodology RE Policy 2015
- RE Policy 2020
- Methodology RE Policy 2020
3. STU Grid Connectivity Procedures, Applications and Formats- A) RE Power Projects
- 1. Solar/Wind Grid Connectivity Procedure
- 2.CO-gen Grid Connectivity procedure
- 3.Application for Grid Connectivity to RE Projects (Annexure A-I)
- 4. Application for Time Extension to Grid Connectivity to RE Projects(Annexure A-II)
- 5. Application for Final Grid Connectivity to RE Projects(Annexure A-III)
- B) Other Power Projects and EHV Consumers
- 1. EHV Consumer Connectivity Procedures
- 2.EHV Consumers GC Procedures
- 3.Application for Grid Connectivity
- 4. Application for Final Grid Connectivity
4.(a) Procedures & Methodologies as per MERC(TOA) 2016 Regulations and its First ammendment 2019- STU Procedures (GC,LTOA,MTOA,BPTA etc.)
- Connection Agreement
- SITE RESPONSIBILITY SCHEDULE
- MERC Tariff Order (Case 239 of 2022)
- BPTA Status
- LTOA/MTOA Applications Status
- LTOA/MTOA Applications Rejected
- Nodal Officer for Grant of Grid Connectivity and & Open Access
- Fees required for applying Open Access
4.(b) Distribution Open Access Monitoring and Review Committee Report- Distribution Open Access Monitoring and Review Committee Report for 2025 dated 14.07.2025
- Distribution Open Access Monitoring and Review Committee Report for 2023 dated 25.01.2024.
- Distribution Open Access Monitoring and Review Committee Report for 2021-22 dated 07.12.2022.
8. Details of Final Grid Connectivity issued to RE Power Projects at MSETCL's Network- Final Grid Connectivity_Wind Power Projects
- Final Grid Connectivity_Solar Power Projects
- Final Grid Connectivity_Bagasse Power Projects
- Final Grid Connectivity_Biomass Power Projects
- Final Grid Connectivity_Small Hydro Power Projects
12.(a) TRANSMISSION CHARGES collected from PARTIAL OPEN ACCESS CONSUMERS by Transmission System Users and disbursed to Transmission Licensees.12.(b) Short Term Open Access TRANSMISSION CHARGES collected by MSLDC and disbursed to Transmission Licensees.17. Launching of Single Window Portal for Renewable Energy Projects under GoM Renewable Energy Policy -2020 - Minutes of 14th Maharashtra Transmission Committee (MTC) meeting held on 18 July, 2025
This page was last updated on 12 Aug 2025